Documents

 

Environmental Review

Planning Commission Staff Report - Review of Draft EIR (4/17/12)
Frequently Asked Questions about the Draft EIR

Notice of Completion (3/28/12)
Notice of Preparation (12/08/10)

Draft Environmental Impact Report (DEIR, March 2012)

Entire DEIR Document
1. Introduction
2. Summary
3. Project Description
4. Aesthetics
5. Air Quality
6. Climate Change
7. Cultural Resources
8. Hazards and Hazardous Materials
9. Hydrology and Water Quality
10. Land Use and Planning
11. Noise
12. Population and Housing
13. Public Services and Utilities
14. Transportation
15. CEQA-Related Assessment Conclusions
16. Alternatives to the Proposed Project
17. Mitigation Monitoring and Reporting
18. Organization and Persons Contacted
19. Appendices

Transit Corridors Plan (March 2012)

Administrative Draft Transit Corridors Plan

Maps and Plans

Transit Corridors Area General Plan Land Use Map
Catalytic Development Sites Map
Catalytic Site #1: Caltrain Station Area
Catalytic Site #2: Vacant Bank Building
Catalytic Site #3: Downtown South Gateway Triangle

Property Fact Sheets

Site 1: Samtrans Site (Former Lumberyard)
Site 2: 111 San Bruno Ave W (Vacant Bank)
Site 3: 104-170 San Bruno Ave W (Vacant Gas Station)
Site 4: 850 El Camino Real (Budget Motel)
Site 5: Downtown Southern Gateway Triangle

Workshop #1 (January 21, 2008)

Workshop Summary
Visioning
Visioning Posters

Workshop #2 (May 16, 2009)

Workshop Summary
Presentation
Vision Framework
Walking Tour Map

Spanish Language Workshop (March 8, 2009)

Workshop Summary

Background Documents

Existing Conditions Report (January 28, 2008)
San Bruno Caltrain Grade Separation Project

2025 San Bruno General Plan
Housing Element (2009-2014)
Staff Report - Consultant Contract
Transit Corridors Plan RFP
Downtown Design Guidelines (1987)
Downtown Parking Study (2000)
Downtown Improvement Plan (2000)
Economic Development Strategic Plan (1997)
Historic Resources Inventory (2003)
Ordinance 1284 (1977)
San Bruno Redvelopment Plan (1999)