PG&E Work in San Bruno
For public information purposes, the table below lists the work being performed in the public right-of-way by Pacific Gas & Electric.

 
Activity
Location
Gas service repair. 400 Block of San Mateo Ave.

Updated 04/23/2012

Rail Projects

PROJECT: Caltrain Grade Separation
CONTACT
: Caltrain, (650) 508-7726
CONSTRUCTION PROGRESS AND DESCRIPTION
95% Design Drawings: Volume 1, Volume 2, Volume 3, Box Culvert Plans

PROJECT: California High Speed Rail Project
CONTACT: California High Speed Rail Authority
PROJECT DESCRIPTION:
The the grade separation project is designed to be compatible with high-speed rail, it's design and construction is coordinated by the California High Speed Rail Authority. In addition, regional section of the track has a local design process.

The design team plans to conduct extensive outreach to receive input on the design of the track section between San Francisco and San Jose. For San Bruno, some of this outreach will be done in conjunction with the grade separation project.

DRAFT Preliminary Alternatives Discussion
Q&A of Alternatives Analysis
EIR-EIS Presentation
Agency Coordination Plan
Technical Working Group Contact Information

 