Part 1: Procurement & Contracting Requirements
- 00 01 01 Project Title Page (PDF)
- 00 01 07 Seals Page (PDF)
- 00 01 10 Table of Contents (PDF)
- 00 01 50 Drawings Tables Schedules (PDF)
- 00 10 00 Notice Inviting Bids (PDF)
- 00 21 00 Instructions to Bidders (PDF)
- 00 24 13 Scope of Bids (PDF)
- 00 31 32 Geotechnical Data (PDF)
- 00 41 00 Bid Proposal (PDF)
- 00 41 70 Addenda Acknowledgement (PDF)
- 00 43 13 Proposal Guarantee - Bid Bond (PDF)
- 00 43 36 Subcontractor List (PDF)
- 00 45 13 Statement of Qualifications (PDF)
- 00 45 14 Bidder Registration and Certification (PDF)
- 00 45 19 Non-Collusion Affidavit (PDF)
- 00 50 20 Bid Addendum (PDF)
- 00 50 50 Notice of Intent to Award (PDF)
- 00 51 00 Notice of Award (PDF)
- 00 52 00 Contract Agreement (PDF)
- 00 52 17 Agreement Release All Claims (PDF)
- 00 55 00 Notice to Proceed (PDF)
- 00 61 13.13 Construction Performance Bond (PDF)
- 00 61 13.16 Construction Payment Bond (PDF)
- 00 61 16 Escrow Agreement in Lieu Retention (PDF)
- 00 61 19 Maintenance and Warranty Bond (PDF)
- 00 63 25 Substitution Request Form (PDF)
- 00 72 00 General Conditions (DOC)
- 00 73 00 Special Conditions (PDF)
Part 2: General Requirements
- 01 11 00 Summary of Work (PDF)
- 01 20 00 Measurement Payment Procedures (PDF)
- 01 26 00 Contract Modification Procedures (PDF)
- 01 31 14 Coordination Public Notification (PDF)
- 01 31 19 Project Meetings (PDF)
- 01 32 16 Progress Schedules and Reports (PDF)
- 01 33 00 Submittal Procedures (PDF)
- 01 41 00 Regulatory Requirements (PDF)
- 01 42 16 Definitions (PDF)
- 01 51 00 Temporary Facilities and Controls (PDF)
- 01 56 36 Temporary Site Security and Safety (PDF)
- 01 60 00 Product Requirements (PDF)
- 01 71 13 Mobilization Maintenance Demob (PDF)
- 01 74 00 Cleaning (PDF)
- 01 77 00 Contract Closeout (PDF)
- 01 78 39 Project Record Documents (PDF)
Part 3: Technical Specifications
- 02 00 01 Basic Site Materials and Methods (PDF)
- 02 41 13 Selective Site Demolition (PDF)
- 09 90 00 Painting and Coating (PDF)
- 10 14 00 Signage (PDF)
- 26 56 19 Roadway Lighting (PDF)
- 31 11 00 Clearing and Grubbing (PDF)
- 31 22 00 Grading (PDF)
- 31 23 13 Subgrade Preparation (PDF)
- 31 23 23.33 Controlled Low Strength Material (PDF)
- 31 23 33 Trenching and Backfilling (PDF)
- 31 25 00 Erosion and Sedimentation Controls (PDF)
- 32 01 23 Hot Mix Asphalt Base Repair (PDF)
- 32 12 16 Asphalt Paving (PDF)
- 32 12 33 Crack Sealing (PDF)
- 32 12 36 Slurry Seal (PDF)
- 32 16 00 Curbs, Gutters, Sidewalk and Driveway (PDF)
- 32 17 23 Pavement Markings (PDF)
- 33 05 23 Utility Pipe Jacking (PDF)
- 33 10 00 Water Utilities (PDF)
- 33 10 50 Separation of Water and Sewer (PDF)
- 33 11 50 Cathodic Protection System (PDF)
- 33 30 00 Sanitary Sewer Utilities (PDF)
- 33 31 20 Sewer Slip-Lining (PDF)
- 33 31 30 Pipe-Bursting (PDF)
- 33 31 40 Cured-in-Place Pipe CIPP (PDF)
- 33 31 50 Bypass Pumping (PDF)
- 33 39 13 Precast Concrete Manholes (PDF)
- 33 39 17 Manhole Rehabilitation (PDF)
- 33 40 00 Storm Drainage Utilities (PDF)
- 33 46 00 Subdrainage (PDF)
- 34 40 00 Traffic Signals (PDF)
Part 4: Standard Drawings
Subpart A: Street Development
Subpart B: Water System
- W-01 - 1 Inch Domestic Water Service (PDF)
- W-02 - 1.5 Inch or 2 Inch Domestic Water Service (PDF)
- W-03 - BackFlow Preventer (PDF)
- W-04 - Cap and Riser Blowoff Assembly (PDF)
- W-05 - 1 Inch Combination Fire and Domestic Water Service (PDF)
- W-05A - 1.5 Inch Combination Fire and Domestic Water Service (PDF)